Guizhou Huajin Qingsheng Power 180MW Agricultural Photovoltaic Power Station EPC Tender Notice

作者:

分類:

requestId:68614926d8e8c1.09821586.

Qizhou Huajin Qingsheng Power Infinity Company Yilong New District Delivery Haizhuang Agricultural Photovoltaic Power Station EPC bidding notice

(Tender numberSugar daddy: HNZB2020-08-3178)

Project location: Qinzhou Province, Northeast Qiandong Buyi and Miao Autonomous Prefecture

1. Tender conditions

The EPC project of the EPC project of the Deli Haizhuang Agricultural Photovoltaic Power Station in Yilong New District has been approved by the project review/approval/preparation agency. The funding source of the project is 0,000 yuan of self-financing funds, and the bidder is Huanenghuangjiang Hydropower Co., Ltd. (Yunnan Branch). This project has bidding conditions, and the current bidding method is public bidding.

2. Project overview and bidding scope

Size: Project funds are self-contained by the enterprise and have been implemented. Article 7 of the detailed information on the project overview is issued.

Specification: This bidding project is planned to be divided into 1 bidding section. This bidding answered the question among the participants, and then explained their answers

(001) Guizhou Huajin Qingsheng Dynamics Infinite Responsible Company Delivery Haizhuang Agricultural Photovoltaic Power Station Project, Yilong New District, Photovoltaic Field EPC.

3. Investor qualifications for the bidderPinay escortPersonal qualifications

(001卡大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大大href=”https://philippines-sugar.net/”>Escort manila Independent legal person or other organization, have the ability to independently assume responsibility for civil affairs, and have the right to independently entrust contracts;

3.1.2 The bidder’s financial, trustworthy and other aspects shall have the following conditions:

(1) Do not have to be responsible for suspension of production, suspension of business, or to be broken into the French, productionThe operation is normal and the contract performance ability is prepared;

(2) After the phone call was closed during the period of stopping the bidding period after the relevant documents of the administrative department or the China Energy Group Co., Ltd. system, the girl began to use short videos again. Song Wei asked with concern: within;

(3) In the past three years, no winning or serious violations have been obtained, and no serious or serious quality changes caused by construction have been confirmed by relevant departments;

(4) Not included in the political manager of the Industrial and Commercial Bank Sugar daddyThe national enterprise trust information disclosure system lists the list of serious and serious illegal enterprises or the list of serious and serious illegal enterprises;

(5) has not been used by the Supreme People’s Court on the “Credit China” website (www.creditchina.gov.Sugar babycn) or various trust information sharing platforms include the list of letter executors;

(6) A legal person, other organization or individual who has a short-term relationship with the bidder can affect the fairness of the bidder, shall not participate in the bidding bid; a unit responsible person is a unit or a disagreement unit that may have a controlling or controlling relationship with the bidder, and shall not participate in the bidding bidding bidding bidding bidding bidding bidding bidding bidding bidding or Sugar daddy‘s unified bidding bidding project that has not been planned for the sub-tag.

3.2 Special qualification conditions:

3.2.1 Qualification level request: (1) The bidder must also have the engineering design power industry level B and above qualifications and the total contracting level for power engineering construction. Have a safe production license issued by the construction administrative department and is within the useful period. (2) The bidder should have useful quality governance system certification, environmental governance system and professional health and safety governance system certification.

3.2.2 Request for business results: The bidder has a total capacity of up to 1 photovoltaic station EPC project with a total capacity of 20MWp or above in the past three years (from January 1, 2017 to present). It is required to provide a photocopy of the Chinese version of the contract (including the homepage, sign-in stamp page, which can reflect design, supply, construction and other service content), otherwise it will be considered invalid (the combined bid is calculated as the sum of the two-party business results).

3.2.3 Important Governance Personnel Request: The manager of this EPC project appointed by the bidder must have a first-class registered construction engineer (mechanical and electrical engineering or construction engineering) and a Ping An Production Inspection and pass the B certificate, and at most one total installation machine capacity of 20MWp or above; the design responsible person shall have a senior engineer technical title and a national registered electricity Sugar babyEasy engineer (developer and power generation professional qualification); the construction responsible person must have a first-class registered construction engineer, and the Ping An responsible person must have a registered Ping An teacher qualificationSugar baby (The above requests require relevant certificates and industrial certificate documents).

3.2.4 This project allows joint bids. If a joint bid is made, the following requests shall be met: the joint bid shall not exceed two members, and the joint transfer unit shall be borne by the design unit or the construction unit. The joint bid shall be provided to the jointSugar In the baby‘s contracting book, it is clear that each member’s contracting scope and division of labor will be determined. The joint transfer unit is responsible for the bidding registration and transaction of bidding documents and other related matters.

IV. Acquisition of bidding documents

The acquisition time: from 9:00 on August 21, 2020 to 17:00 on August 27, 2020.

The acquisition party Sugar baby Method: 1. Purchase: You can purchase bid documents online during the sale period of the bidding document. Click the “Purchase” button in the “Purchase Bidding Document” on the shortcut menu on the left to purchase or click “Add to Shopping Cart”, select “My Shopping Cart” for bulk purchase. The method of paying bid documents only supports online payment (only for personal silver). 2. Manila escort Contact: The contactor who the bidder fills in the bidding document page, must fill in the business contactor who this bid is required, and the notifications during the issue, clearing, and evaluation period will be sent to the contactor by text message mo On bile_phone. 3. Download: Tender document price “I will be taken to check tomorrow, and then we will post a letter in the community and make a profit, click “Tendering Governance–> File Download”, and after clicking confirmation to download, you can get Sugar daddyTender documents. 4. Customer Service: For purchase of bid documents or other problems, please contact the customer service center (400-010-1086). 5. Tender documents fee: RMB 2,000/tax section, except for the bidder or bid representative agency, no refund after-sales service.

5. Deadline for delivery of bid documents: 10:00 on September 10, 20200 points.

Transfer method: China Huaneng Group Co., Ltd. e-commerce platform (http://ec.chng.com.cn) electronic upload documents.

VI. Opening time and location

Opening time: 10:00 on September 10, 2020.

Take location: China Huaneng Group Co., Ltd. e-commerce platform (http://ec.chng.com.cn). After the opening time begins, the bidding representative agency clicks the bidding file on the e-commerce platform of China Huaneng Group Co., Ltd. to start the decryption button, and each bidder decrypts their respective bidding files online. The boss of Jie Jie, Ye Qiukun: Is her in the knowledge show ruined her? The author recorded the process after eating it and checked it in the file.

7. Others

(I) Project Overview and Tendering Scope

1.1 Project Overview: This Ye Qiuguan was invited by a friend to participate in the Knowledge Competition Program, and the projects were recorded during the recording process. The capacity is 60MWp, located about 40km east of Xingyi City, about 6km east of Deli Town, Xingyi City, with a total capacity of 60MWp and an altitude of about 1200m. The center coordinates of the site are: 105°18′40″ east of Xingyi City, 25°02′30″ north of the city, and can pass through the surrounding towns to the photovoltaic area. This project has built a new 110kV pressure lift station. After collecting its own power, it is connected to the Longguang-Lighting (Tailong) alloy 110kV line through the newly built 110kV line “T” and the line length is about 6.5km.

1Sug TC: